The Refurbishment Risk Register
12th December, 2025
10 COMMON MISTAKES & HOW TO AVOID THEM
Refurbishment projects are statistically more prone to risk than new builds because you are working within an existing, often occupied, asset. Based on our experience and the Maris 37 Fit-Out Mistakes guide, here are the top 10 specific pitfalls to watch for.
1. Starting Without Clear Objectives
The Error: Jumping into design with vague goals like “a better office” or “more collaboration” without defining what success looks like.
The Fix: Begin with a Strategic Brief. Define measurable objectives (e.g., “increase desk utilisation by 20%” or “reduce operating costs”).
2. Underestimating Timescales
The Error: Compressing the schedule to meet an arbitrary deadline. This often leads to costly compromises or overtime premiums.
The Fix: Build a realistic programme that includes “buffers” for approvals, landlord consent and long-lead items.
3. Inadequate Stakeholder Alignment
The Error: Proceeding without a united leadership view. Internal misalignment leads to political friction and scope creep mid project.
The Fix: Build a cross-functional steering group from Day 1. Address resistance head on rather than letting it simmer.
4. Overlooking Building Constraints
The Error: Designing a layout that the building cannot physically support (e.g., insufficient floor-to-ceiling heights or service routes).
The Fix: Conduct technical due diligence early. Survey the building and review “As Built” drawings before design begins.
5. Choosing the Wrong Fit-Out Partner
The Error: Selecting a partner based solely on the lowest price. This often leads to poor quality, delays and financial exposure later.
The Fix: Vet partners for financial stability, cultural fit and specific experience in occupied refurbishment.
6. Design Without Operational Input
The Error: Failing to involve IT, Facilities or HR in the design process, leading to a space that looks good but fails to function.
The Fix: Walk operational teams through the proposals. Ask “What frustrates you about the current space?” and incorporate their feedback.
7. Inadequate Change Management
The Error: Treating the project as purely construction. Staff who feel the space was “done to them” will resist using it.
The Fix: Create a communications plan. Appoint “Champions” from different departments to model enthusiasm and gather feedback.
8. Cutting Corners on Quality Control
The Error: Letting standards slip in the rush to finish, leading to permanent defects and ongoing maintenance issues.
The Fix: Implement rigorous QA processes. Do not sign off on Practical Completion until the agreed standards are fully met.
9. Value Engineering the Wrong Things
The Error: A chaotic handover with missing manuals and incomplete training, leaving the Facilities team unable to run the building.
The Fix: Treat Handover as a phase, not a date. Compile warranties and O&M manuals as you go, not at the end.
10. Failing to “Futureproof”
The Error: Walking away once the ribbon is cut. Without measurement, you cannot prove ROI or learn for future phases.
The Fix: Schedule a review 3 to 6 months after move-in to survey staff and track KPIs against your original goals.
Additional Pitfalls to Watch For:
Acoustic Failures: Creating open-plan zones without sufficient sound absorption.
Tech Friction: Installing complex AV systems that are not user-friendly.
Dilapidations: Failing to budget for the reinstatement of the old layout.
ESG Misalignment: Setting sustainability goals but failing to follow through in material selection.
You May Also Like
Turn Strategy Into a Workplace Brief
17th July, 2026
Negotiation Is About Leverage, Not Discounts
17th July, 2026
Commercial Control Before Construction Starts
16th July, 2026
Will Your New Office Work on Day One?
16th July, 2026
How to Choose the Right Property Adviser
15th June, 2026
What Technology Should Actually Do in Your Workplace
15th June, 2026