The Fragmentation Trap
27th October, 2025
THE SEQUENTIAL DOMINO EFFECT
The traditional Design-Bid-Build framework provides the illusion of absolute design control and transparent competitive tendering.
In reality, global research by McKinsey reveals that large-scale fragmented projects typically take 20% longer to finish than scheduled and regularly run up to 80% over budget. This catastrophic drift is triggered by a sequential domino effect:
1. The Design Vacuum:
Because the main contractor is isolated from the early conceptual phases, they cannot leverage their practical expertise to improve the buildability of the architect’s vision.
2. The Tendering Illusion:
When the incomplete design is finally tendered, desperate contractors bid precisely on the flawed drawings provided, deliberately excluding missing acoustic or fire-stopping details to make their initial price look attractive.
3. The Site Standstill:
Once construction begins, bespoke architectural details often prove physically impossible to build. The contractor stops work, issues a formal Request for Information and hits the client with a massive bill for delay damages.
You May Also Like
Turn Strategy Into a Workplace Brief
17th July, 2026
Negotiation Is About Leverage, Not Discounts
17th July, 2026
Commercial Control Before Construction Starts
16th July, 2026
Will Your New Office Work on Day One?
16th July, 2026
How to Choose the Right Property Adviser
15th June, 2026
What Technology Should Actually Do in Your Workplace
15th June, 2026