The Fragmentation Trap
27th October, 2025
THE SEQUENTIAL DOMINO EFFECT
The traditional Design-Bid-Build framework provides the illusion of absolute design control and transparent competitive tendering.
In reality, global research by McKinsey reveals that large-scale fragmented projects typically take 20% longer to finish than scheduled and regularly run up to 80% over budget. This catastrophic drift is triggered by a sequential domino effect:
1. The Design Vacuum:
Because the main contractor is isolated from the early conceptual phases, they cannot leverage their practical expertise to improve the buildability of the architect’s vision.
2. The Tendering Illusion:
When the incomplete design is finally tendered, desperate contractors bid precisely on the flawed drawings provided, deliberately excluding missing acoustic or fire-stopping details to make their initial price look attractive.
3. The Site Standstill:
Once construction begins, bespoke architectural details often prove physically impossible to build. The contractor stops work, issues a formal Request for Information and hits the client with a massive bill for delay damages.
You May Also Like
The Role of Technology in Modern Workplace Design
15th June, 2026
Building a Strong Company Culture in the Age of Hybrid Work
1st June, 2026
Glossary
22nd March, 2026
Your Estate Is Your Strongest Recruitment Asset
16th March, 2026
Working With Maris
13th March, 2026
Why Relocate?
9th March, 2026